|
|
Rapid-Turn, High Mix, Low-to-Medium
JIT Production Quantity
|
| |
--
|
Rapid-Turn: First-article
PCBA can be expediently fabricated and delivered as quickly as
3-day turnaround time; shorter delivery time for cable assemblies
are routinely and consistently achievable.
High Mix: Multiple first-article production
items can be rapidly set up to satisfy our customers' exceptional
demand and with stringent JIT expectation.
Flexible Quantity:
MAI’s facility is readily configurable and adaptable for running
various sizes of production volume.
|
|
|
Turnkey Solution, Full or Partial Consignment,
Materials Procurement |
| |

|
Turnkey Solution: MAI is set up to help
our customers to purchase all needed materials for complete production/fabrication
needs.
Partial Consignment: MAI will purchase
customer-designated limited materials as required by contractual
agreements for productions.
Full Consignment: MAI is also
set up to receive all materials from customers needed for manufacturing
and/or production contract.
|
|
|
First-Article Manufacturability Issues Analysis
and Fab Issues Reports
|
| |

|
PCB Manufacturability Issues Report:
First-article PCBA fabrication issues are to be analyzed and reported,
if needed by customers, to sort out and to analyze various issues
on manufacturability matters.
Cable Manufacturability Issues Report:
First-article cable assembly fabrication issues are to be analyzed
and reported if necessary and demanded by customers.
PCBA Functional Test & Cable Assembly Continuity/Pull
Test:
PCBA Functional Test and First-article cable test can be electronically
and/or mechanically evaluated, if required. |
|
|
On-Demand (JIT) Manufacturing and Test Services
|
| |

|
PCB Custom Tests: Functional Verification,
Operational Readiness, and Systems Test can be arranged at MAI
facility for timesaving and risk minimization.
PCB Rework & Inspections: Nonconformance
PCBA fabricated by other manufacturers can be re-inspected or
reworked by MAI.
Complete Box Build: Includes Integrated
System Tests, Functional & Operational System Checkouts, and
Final Mechanical Assembling.
|